Case Study · Road Runner Sports In-Store Events

One Brief.
Three Schedules.

Over one year I built three event landing pages from the same request: show people what's happening, when, and where. Each event had a different structure, and that structure decided the layout.

RoleDesign & front-end development
PartnerRRS Events & Retail Experience team
Deliverable3 CMS-embedded landing pages
TimelineAug 2025 – Jul 2026
Saucony Endorphin events page: a row of five store cards, each with its own event schedule
Saucony Endorphin events, July 2026: five stores, each with its own schedule

01 — The recurring brief

Same request, different event

Requests came from our internal events and retail experience team, usually with about a month of lead time. Each page was built as an embedded component in our CMS, so it had to sit inside the site template without breaking anything around it. Mobile was always a priority: every layout had to hold up on a small screen.

Approvals were usually quick. The real work came afterward, because event details change constantly. Times shift, a giveaway gets added, a store's date moves. A page that looked right at launch also had to be easy to update the third time someone sent a change.

The question was never "calendar or no calendar." It was "what kind of event is this?"
Aug 20251 store · 2 weekends · a different event each day

A fixed run of days, each with its own event.

→ Week rows, day columns
May 20261 store · 1 month · overlapping promotions

Events that lasted anywhere from two days to the whole month.

→ Vertical timeline
Jul 20265 stores · 3 events · different dates

The same three events, scheduled differently at each store.

→ Describe once, schedule per store
Build 01San DiegoAug 2025

Saucony In-Store Experience

For two long weekends, our San Diego store became Saucony HQ. Every day had its own event: a Strava community run, a VIP recovery night, a run crew open house, in-store yoga, a quiz and a prize wheel. Some were open to everyone, some were VIP-only, and one required a reservation.

With eight days in two clear weeks, the schedule already had a calendar-like structure, so I used it. Each week got a bright lime header band, with the four days in columns beneath it. Every column follows the same order: date, event name, time, a short rule, the description, then any eligibility note in small italics. On mobile, the columns stack into a single list with alternating background tints so each day stays distinct.

Saucony In-Store Experience hero with event dates and a four-photo gallery strip
Hero and dates, then a photo strip to set the mood
Week 1 schedule: four columns for Thursday through Sunday, each with event name, time and description
One band per week, one column per day

It worked because the schedule was regular: a fixed number of days, one event per day, no overlaps. The next brief didn't fit that structure.

Build 02Uptown PhoenixMay 2026

Grand Opening Celebration

The new Uptown Phoenix store wanted a full month of celebration. A $500 shopping-spree entry ran all of May. A 20% new-VIP offer covered the first two weeks. A tote bag giveaway lasted one weekend, a Memorial Day Rewards Cash event ran over the holiday, and a buy-one-get-one sock and insole deal closed out the month.

Day columns couldn't handle that. A month-long promotion would have to repeat in 31 cells, and a two-day giveaway would get lost among them. A full calendar would mostly be empty days with the overlaps hard to read. So I switched to a vertical timeline. The date range sits in a narrow left rail, and each promotion gets one card on the right with a colored badge for its type: Lucky Winner, Special Offer, Giveaway or VIP. Cards are ordered by start date, so you can see what's on right now at a glance, however long each promotion runs.

Uptown Phoenix grand opening hero with postcard-style lettering
Postcard-style hero to set a celebratory tone
Vertical timeline of five promotions, each with a date range, a colored badge and a description
Date ranges on the left, one card per promotion, badges for type

I scoped all the CSS under an rrs-pt- prefix so the component couldn't collide with the CMS's own styles. When promotions were added or changed during the month (the Memorial Day card launched as "stay tuned"), each update meant changing a card, not reworking the layout.

Build 035 storesJul 2026

Saucony Endorphin In-Store Events

The third brief was the trickiest: five stores (San Diego, Bellevue, Campbell, Falls Church and King of Prussia), each hosting the same three events on different dates. Five timelines would have repeated the same three descriptions five times and buried the one thing each visitor needed, which was when it's happening at their store.

So I separated what from when. The three "Elevated Moments" are described once, each with a photo and a short paragraph. Below them, each store gets a compact card with a photo of the storefront, its three dates and times, and a link to the store page. Repeated information appears once, and the information that differs by store is easy to compare. A checkered divider nods to the racing flag, and a shoe section at the end compares the Endorphin Pro, Speed and Azura using sliders for responsiveness and cushioning.

Make Fast Feel Easy hero with Saucony and Road Runner Sports logos and a checkered divider
Hero and checkered divider
Three Elevated Moments: Unwind with Saucony, Ice Cream Social, Tote Customization Station
What: three events, described once
Five store schedule cards
When: one card per store
Shoe comparison of Endorphin Pro 5, Speed 5 and Azura with responsiveness and cushioning sliders
Shoe comparison with simple sliders instead of a spec table
Mobile view of the hero
Mobile · hero
Mobile view of a store schedule card
Mobile · store card

What tied them together

Principles I keep coming back to

Outcome

Three events, all launched on time

Each page launched on time, with quick approvals and a steady stream of edits as event details changed. I don't have on-page analytics to share. The most useful result was a way of working: before choosing a layout, I map out the event's structure first. I now use that for anything time-based, not just event pages.