Case Study · Internal Team Tool

Write It Down.
Check It Off.

Our email reviews kept catching the same missing details, and the definition of a "good" email kept changing. I turned that feedback into a shared checklist, so the team only had to hear each note once.

RoleConcept, writing & build
Used byEmail designers & reviewers
FormatStateless HTML tool, also in Litmus
Scope7 sections · 26 items
Email project checklist with a progress bar at 35 percent and several items checked off
A progress bar, plain-language items, and notes that explain the standard

01 — The situation

Drafts still get judged as finished emails

We have regular review meetings with our owner and CEO. He has high standards, and his idea of what makes a good email changes over time. Even when we presented work as a draft, the feedback usually wasn't about the design direction. It was about what was missing: how many colors a shoe comes in, whether a shoe was men's or women's, what the subject line was.

None of these were big mistakes, but they kept coming up. Each designer heard a slightly different version of the feedback in a different meeting, and most of what we'd learned lived in people's heads. When the standard changed, there was nowhere to record the new one.

The problem wasn't careless work. The standards just weren't written down anywhere.

02 — The idea

Turn feedback into a checklist

I wanted one shared place that answered "what does a finished email need?" for anyone on the team. It had to be quick to use in the middle of a project and easy to update the next time expectations changed. I didn't want a policy document. A checklist people dread doesn't get used, so the tone stayed friendly: "No stress — just a friendly reminder of the good stuff."

The sections follow the order a project actually moves through, from the brief to the send:

  1. Brief & strategy
  2. Layout
  3. Copy
  4. Content & photography
  5. Approval
  6. Code & build
  7. Launch

The most useful parts are the notes under some items. Each one records the standard behind the item, so the next person doesn't need to have been in the meeting where it was decided.

The recurring review noteWhat it became on the list
How many colors does this shoe come in?Add shoe support modules, swatches or a "# of Colors Available" callout for every shoe
Is this the men's or women's shoe?Note the gender of each featured shoe
What's the subject line?Subject line and preview text visible on the proof
Too many black and white shoesFeatured shoe colors are bright and colorful, unless there's no other option
Generic "Shop Now" buttonsCTA is specific: numbers, names or categories

03 — The build

Simple enough not to break

It's a single HTML file with no framework, backend or login. Checking an item updates a progress bar, and Reset clears it for the next project. Nothing is saved, on purpose: there's no database to maintain and no stale state from someone else's last project. The items live in one plain list in the code, so adding a standard or rewording an item takes a minute.

It also lives in our Litmus account, so reviewers see the same list alongside the email proofs.

Content and photography section of the checklist
Content & photography: where most review feedback ended up
Code and build section of the checklist
Code & build: the technical side, with targets
Try it · live copyOpen full screen ↗

04 — How it's used

A reason to slow down

Designers use it most, and the biggest benefit comes at the start of a project, not the end. Going through the brief and layout sections early shows what's missing while there's still time to ask, so questions go back to whoever wrote the brief instead of coming up in a review.

It also slows people down, in a good way. Taking a minute to review before building catches the things that would otherwise turn into revision notes.

The list is never finished. When a new request or standard comes up, it gets added, and I update one file instead of explaining the change to everyone separately.

05 — The outcome

Fewer revisions, fewer surprises in the room

Projects now go through fewer revision rounds. The CEO's direct feedback about missing pieces (the colors, men's vs. women's, the subject line) has mostly stopped.

That's the result I care about most. The checklist doesn't make anyone a better designer. It just means everyone starts from the same, current definition of done.